Cleat Replacement

Step 1: Using a 4mm (Allen wrench) hex tool, remove 4 bolts per peg. Remove cleats from peg bases.

Step 2: Before installing new cleats, make sure all surfaces are clean and apply one drop of medium strength Loctite Blue #242 (or equivalent) to the threads of each of the 8 bolts.

Step 3: Install new cleats to bases using the provided bolts. Install each bolt by hand before tightening. With all bolts installed, tighten each bolt to a torque spec. of 8.3 lbs/ft (100 lbs/in.) or (11.3 N/m).

Sign up for our Newsletter




* = required field

Rider Spotlight - Malcolm Stewart

Twitter: @Mookie_37
Team: JDR/J-Star/KTM
Bike: KTM 250SX-F
Handlebar: Contour Windham
Grip: Half Waffle Med

Read More